logo
logo
  • Who We Are
  • What We Do
  • Portfolio
  • Community
  • logo
    logo
  • Gilbert Electric
  • Careers
  • Contact
  • Articles
Cannon & Wendt Abrazo Arrowhead Hospital Central Plant
Cannon & Wendt Abrazo Arrowhead Hospital Central Plant Power Shut Down
Cannon & Wendt Abrazo Arrowhead Hospital Central Plant Raceway and Controls
Cannon & Wendt Abrazo Arrowhead Hospital Central Plant Chiller Emergency Shut Down

Abrazo Arrowhead Hospital Central Plant

Coordinated with Siemens to install pathway & cabling, terminations and test and commission the BAS systems


TypeInstall pathway, cabling and terminations for Building Automation SystemSF250,000 SFLocationGoodyear, ArizonaDateCurrent

Share

Related Projects


Mayo Clinic Integrated Education and Research Building (IERB)

JW Marriott Desert Ridge

Block 22/Collier Center

  • Prev
  • Back to Main Portfolio
  • Next
Cannon & Wendt

4020 North 16th Street
Phoenix, AZ 85016
Directions

info@cannon-wendt.com
602.279.1681

Gilbert Electric

1760 East Pace Ct
Tucson, AZ 85719
Directions

info@cannon-wendt.com
520.884.8020

Licenses

DUST CONTROL #SC0800755
ROC068027
ROC027458
ROC068026

Quick Links

Apply
Contact
Privacy Policy

© Cannon & Wendt Electric Co.  |  Website by Small Giants

Privacy Preference Center

Privacy Preferences