logo
logo
  • Who We Are
  • What We Do
  • Portfolio
  • logo
    logo
  • Gilbert Electric
  • Careers
  • Contact
  • Articles

ASU Sun Devil Stadium Renovation

Renovation of a stadium seating 57,100 people and is approximately 1,254,333sf which includes 9 levels total.


TypeElectrical, Fire alarm, audio visual, security and Tele-Data raceway, Design Assist, Cost Estimating and Value Engineering.SF1,254,333LocationTempe, ArizonaDateOctober 2017

Share

Related Projects


BetMGM Sportsbook

Lone Butte Casino Renovation

Gila River Coyotes Arena

  • Prev
  • Back to Main Portfolio
  • Next
Cannon & Wendt

4020 North 16th Street
Phoenix, AZ 85016
Directions

info@cannon-wendt.com
602.279.1681

Gilbert Electric

1760 East Pace Ct
Tucson, AZ 85719
Directions

info@cannon-wendt.com
520.884.8020

Licenses

DUST CONTROL #SC0800755
ROC068027
ROC027458
ROC068026

Quick Links

Apply
Contact
Privacy Policy

© Cannon & Wendt Electric Co.  |  Website by Small Giants

Privacy Preference Center

Privacy Preferences